Home > categories > Construction & Real Estate > Gypsum Ceiling > Living room ceiling above the installation of downlights and then open the lamp ah?
Question:

Living room ceiling above the installation of downlights and then open the lamp ah?

Living room ceiling above the installation of downlights, the ceiling is the first hole and then paint, or the first paint, and then open the lamp ah?

Answer:

Hole size standard, then does not matter, because the edge of the lamp cover with a lamp cover. It is best to open the first hole, and then paint, lighting, if the installation of damage, the painter to make up some friends.
Of course, the first hole, and woodwork live mouth, after the end, the last is the oil workers live. And then installed lamps, moving appliances.
We are more woodwork before the end of the requirements of the light hole to open a good
First paint and then open the hole. Specific steps are as follows: First according to the drawings of the lamp position of the layout of the wire; First gypsum board ceiling to do the overall shape; Gypsum board nail eye repair; And then the surface of the gypsum board batch putty project; After the end of the batch of putty, and then the surface of latex paint primer brushing, and then finish the brushing; The opening is also made by the electrician to open the hole, because the location of the original wiring and the length of the reserved wiring, the electrician heart most understand, so the electrical hole to better control the location to ensure that the length of the reserved wire To the downlight; of course, these locations are also rooted in the size of the drawings, the error will not be too much.
Even the first hole is the first hole and then paint, so I bought the lamp in advance.

Share to: