Home > categories > Construction & Real Estate > Mortar > M10 mortar mix design and raw material test a total of how much material?
Question:

M10 mortar mix design and raw material test a total of how much material?

M10 mortar mix design and raw material test a total of how much material?

Answer:

Send you when asked to send, if you do not send a small SN20KG, SHA40KG
Should be enough In fact, the laboratory is not the number of the main time in the inspection when the cement should be sieved
The requirements of each test station is different, usually cement 20KG, sand 40KG