Matters needing attention in the installation of solid wood flooring
For the wood floor installed every step to do careful installation requirements for installation, and, after the new pavement above the cement floor, the ground must be more than 90 days to determine the dry, dry ground.
Should pay attention to the solid wood floor can not be installed in some directly affected by the sun and rain on the ground, otherwise it is easy to damp, very perishable, such as toilet, bathroom and balcony and other places, there is no electric heating floor laying on the ground, but can be laid in the plumbing on the ground.
In the examination of the ground must be careful, we must pay attention to the floor must be smooth, to within the specified value range, but also to ensure that the ground clean.