Home > categories > Machinery & Equipment > Tower Cranes > Method for operating tower crane
Question:

Method for operating tower crane

Method for operating tower crane

Answer:

In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.

Share to: