New building formwork support is all steel
The sun angle is used to connect with the cross beam of the outer wall to ensure the angle of the shear wall. The angle of Yin is used for turning the inner wall and connected with the cross beam to ensure the angle of the shear wall. The pull rod is composed of a ground hook, a rod adjusting screw rod and a buckle. Buckle hook and prefabricated description on the ground to draw connection on the top of the connection with the beam through the adjustment screw, ensure the verticality and location of transverse shear wall [hole hole] bar bar bar need to connect with a hook head bolt fastened through wire rod, ensure the transverse shear wall in the doorway of the width and size requirements. The through wall screw is composed of a screw rod gasket and a nut which are used for fastening the crossbeam and the door card. [] similar to the fan-shaped nut fastener gable wall screws for fixing the bayonet.
The shear wall formwork support combination device is composed of a shear wall formwork support assembly device, which is composed of a cross beam, a vertical beam, a positive angle, a negative angle, a top pull rod, a door card, and a wall screw arch fitting. [] with the thickness of the vertical beam forming 2.75mm cold-rolled steel plate, welded by the jacket, Easter, Liang Xin. The structure and properties of the same column template support vertical beam structure. The cross beam is composed of an outer casing, a beam core, a movable joint, an outer sleeve and a beam core which are provided with a rectangular hole which is used for adjusting the size of the through wall screw
The utility model relates to a supporting structure of a new type of shear wall formwork support, which is assembled and assembled by flexible steel components of various sizes. All steel productsThe utility model has the advantages of saving a large amount of wood, the shaping of the tools, and the standardization of the workersThe utility model has the advantages of flexible regulation and arbitrary combination, which brings convenience to the construction and greatly improves the construction efficiencyThe utility model provides a guarantee for the engineering quality, and the concrete construction fully achieves the effect of the clear water concreteRepair stage of the plastering process, shorten the duration of the project also greatly save money.