Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.