PE how about the installation of plastic pipes?

PE how about the installation of plastic pipes?

Answer:

When the pipe connecting pipe end should be clean, every day when the nozzle should be temporary plugging, prevent debris into the tube. 7, after the connection of the pipeline should be carried out visual inspection, unqualified immediately rework.
Measures should be taken to protect or adjust the connection process under cold weather (--5 degrees below) and strong wind conditions
Pipe and pipe fittings should be placed in the construction site for a certain period of time after the connection, so that the pipe and pipe temperature is consistent
1, pipe connections, the pipe and pipe fittings and ancillary equipment should be checked according to the design requirements, and should be in the construction site for visual inspection, in line with the requirements can be used. Main inspection items include pressure rating, external surface quality, matching quality, consistency of material, etc.. 2, should be in accordance with different forms of interface using the corresponding heating tools, shall not use open flame heating pipes and fittings. 3, the use of welding methods connected to the pipeline, should use the same brand material of pipe and pipe fittings, for the performance of similar, must pass the test, qualified before.