Question:

Plastic floor construction technology

nan

Answer:

1, construction materials, construction direction to confirm the construction materials should be the same batch number. Room temperature and material to adapt (adsorption operation).
Connection constructionWhen cutting second floors, consider the alignment with the first floor lines (as far as possible with the need to align the lines of the floor).Cut the second floor when the floor is placed on the first, in the middle, at both ends of the "V. scraper" font marking, cutting the ends of the floor and the wall to leave part of the construction. Large construction can also be connected to the same step construction.
2, the standard method of constructionFrom the beginning of construction of the best room entrance, so that the floor is the seam at the door.Construction materials should be more than the actual length of stay 5CM cut, laying on the ground.When cutting, the material should be adapted to the room temperature.There are lines of color to try to align the line construction.Wall and corner of the cover of the material to be fully pressed by hand ("V"), according to the wall curve (to stay 5CM) cutting.When cutting to keep a certain distance from the wall, to be retained to the skirting line can cover the position.

Share to: