Rules for operation of impact pile drivers
Two, piling construction process, before piling construction, in the construction site around the axis control network testing and protection, and do a good mark, and transfer procedures. The construction process is as follows: lofting pile two Pile Lofting pile pile on pile machine machine alignment machine to feed the pile piling pile verticality correction electric welding welding cooling design requirements to stop piling pile hammer machine machine three, hammer pile construction technology and quality control measures of each Pile Lofting after two times of review and correct aligned with the pile location insert, the first section is slow into the retaining pile verticality, upper and lower section pile after aligning welding, welding inspection by the parties after natural cooling time to meet the requirements after piling, final penetration and elevation controlled by the supervision, party a visa confirmation after the stop hammer machine construction. (1) the quality of the pile is guaranteed by 1. After each pile comes into play, the pile shall be discharged after passing the qualification evaluation (including the qualification certificate, the pile type, the date of manufacture, the appearance quality, etc.), and the pile shall be stacked in plain and not too high layers.