All kinds of floor installation to go through a few steps: 1 check the ground flatness, flat ground can make your ground pavement more convenient, but also to prevent the floor is not flat. 2 laying mats, because the solid wood flooring does not need to set up the same as the solid wood flooring keel, so, as long as the paved mattress can be directly taste the taste of bamboo sticks. 3 to avoid the time in the installation of scratches ah, dirty, etc., for your beautiful floor. 4 laying the floor as much as possible to find a good team to lay out, like the well-known domestic laying team with the elephant, Beijake and some other large enterprises floor laying team, laying effect is better
First, the solid wood flooring installation method 1. To determine whether the ground is flat, local uneven can do local leveling, if a large area should be considered uneven self-leveling, solid wood flooring installation and use of the ground roughness relationship is great. 2. If there is no problem with the ground, you can lay a special mat after the pavement. 3. Solid wood composite floor without keel, no nails, no glue. Between the floor and the wall to leave 8-12 mm expansion joints, and add spring steel and spring. Each hundred square meters: about 40 steel leaf springs, about 200 springs. 4. The installation process, the installation part of the best at any time with cardboard or other things covered up, because many scratches are so happened. 5. Immediately after the end of the ground to clean up the floor in time to do maintenance. Second, the solid wood flooring installation method 1. Laying keel, keel spacing according to the length of the floor to determine. But it is best not to exceed 400MM. 2. Note that check the keel fixation, be sure to carefully check again, once the keel fix problems late repair is very troublesome. 3. keel installation should pay attention to leveling, the ground part of the bump to deal with. Whether the keel is leveling is related to the stability and comfort of the floor. 4. Floor installation method is divided into 1/2 and 3.6.9. The specific situation according to the room area, floor specifications to determine. This is best to seek the views of carpenters, they are very experienced. 5. keel dry, wet two, if the use of wet wood, must wait until the wood is completely dry before the installation of the floor. 6. Cover the installation at any time to avoid scratches. 7. timely floor maintenance.
There are four mounting methods for solid wood flooring. 1) keel pavement method: that is, wood keel and steel keel pavement method, this is the need to do wood keel. 2) Suspended pavement method: that is, the use of moisture-proof film or moisture-proof pad to install, this method is more popular way. 3) direct paste method is environmentally friendly floor glue paving method. 4) Wool floor bottom method. This is the main installation method of solid wood flooring, depending on the installation method, need different tools and materials. 1) Before the floor is installed, the parquet is in place. The installer needs to check the number of floors and the number of accessories with the customer first, and check whether there is any damage, and ask the customer to confirm the signature. Then, to confirm the amount of floor, the ground flatness, the use of auxiliary materials, wait until everything is correct, and then install. 2) After installation must pay attention to acceptance, mainly solid wood composite floor surface should be clean, no burr, groove marks, corners without defects, paint full, no leakage paint, laying solid.