Solid wood flooring installation precautions?
With the installation of enhanced floor almost
1, first of all to confirm the floor of the material varieties, grades meet the design requirements, moisture content should be about 10%. 2, visual inspection of the surface of the floor planing, polished, non-invasive marks, clear pattern, clear oil level consistent. 3, pavement direction to be correct, the level of seams tight, the wrong position of the joints, the surface clean. 4, skirting board laying seams tight, surface light height and wall thickness consistent. With 2 meters by foot inspection, the ground flatness error is less than 1 mm, the gap width is less than 0.3 mm, skirting board flatness error is less than 3 mm, patchwork flatness error is less than 2 mm. 5, if it is Xia Shan compensation side forging fan brace boxing singing season, the reserved seam may be appropriate to stay a little less, if it is winter installation, reserved seam will stay a little more.
Careful, patient, patient