Reinforced concrete shear wall is supported by the use of prefabricated concrete strips as a support on both sides of the template, the country is allowed to use
For no protection (waterproof, explosion-proof, etc.) requirements, this is possible, as long as the strength of the support bar is greater than or equal to the strength of the wall on it.
Can protect the template from damage, extend the life of the template. Easy to operate, save time and labor, will not produce rust, can be removed from the wall repair, can significantly reduce the cost of the project costs.
Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.
Reinforced concrete shear wall support commonly known as: reinforced concrete rods. The use of prefabricated concrete strips as a support on both sides of the template, the state allows the use. But in the case of waterproof requirements should not be used to avoid causing moisture into the room with the concrete into the room, affecting the impermeability level. There are waterproof requirements when the general use of water bolts, end welding template limit card. Reinforcement limit concrete card card strength grade in line with the requirements of the shear wall, the length of the bar to meet the thickness of the protective layer can be. The state does not expressly regulate, but provides that any support does not affect the quality of concrete pouring and the use requirements.