Home > categories > Sports & Entertainment > Artificial Grass & Sports Flooring > What about the construction process of the artificial grass football field?
Question:

What about the construction process of the artificial grass football field?

What about the construction process of the artificial grass football field?

Answer:

1, site leveling, soil compactionSite smoothness: the flatness pass rate is above 95%, and the density of plain soil is more than 95%2 、 cement concrete foundation constructionSite base acceptance
A, on-site measurement and inspection of the foundation, and check the basic acceptance of your foundationData verification, construction requirements can be reached before construction, for the foundation is damagedPut forward the repair plan in time.B, site cleaning, cleaning all debris on the basis, rinse and useFan drying.
Laying artificial lawn cushionA composite elastomer that is placed under artificial turf to absorb impact,It has high impact absorption, good drainage and moisture retention.Absorb the impact of the stadium by as much as 55%, increasing the elasticity of the ball's artificial turf,To make it closer to a good natural lawn, you can avoid kicking and kicking in the course of kickingThe sports injury turned up, and feel the ball movement to feel comfortable effect.
A, in order to ensure the quality and smoothness of artificial grass pavement, in line with FIFAThe regulations provide for the quality and perception of the use of artificial grass in the future,According to the drawing requirements, the playground longitudinal, horizontal, two axis to find, locate the playground center position,Locate the boundaries of the playground.B, according to the specifications of the drawings and the planning, measurement and layout of the artificial turf field

Share to: