First of all, what are the construction of the structure of the template, such as walls, columns, beams and ladders, which is the structure of the first installation of the template after the installation of steel? Ten
Who told you that?. Shear wall, column is the first binding steel, and then close the template, if the two sides of the shear wall formwork and the death of the death of the column template, but also how to bind and connect steel
The template of the beam can be completed in two or once. The two is complete, first beam bottom mould, then binding steel beam and plate, and side template; a beam bottom and side is template template and template to support end, then lashing steel beam on the template, binding after the beam falls on the beam within the template, and then tie plate reinforced.
On the contrary, the beam plate is the first template, tied after the reinforcement, because the beam plate is flat, the first binding steel, do you want to let the first suspension? That's not going to collapse