What are the components of rotary drilling rig Jixietaiban? How to calculate?
Like other large machinery, can refer to the crawler crane, but the fuel consumption and artificial to determine, including other auxiliary drill wear, repair, drill tooth replacement, to see more big rig, for what geological construction.
This contract according to the geology and site conditions have different changes, according to a 24 hour standard, a drill, a crane, a forklift, each driver two, a site manager, coolie four, perfusion six, a welder, purchasing a drill, water pump and other auxiliary vessel some general tools, according to the size of pile, geological conditions of pricing, how much money per meter.