What are the functions and requirements of the masonry wall
4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
security1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.