Home > categories > Electrical Equipment & Supplies > Instrumentation Cables > What are the national standards involved in mining cables?
Question:

What are the national standards involved in mining cables?

In the laying of the time when there is no specific requirements if not and some cable to go the same bridge more

Answer:

. in the bathroom before the first design of a good shower room size of the embedded hole at the same time consider good wiring leakage protection and so on. . if the bathroom water supply system and the tiles have been installed should choose a custom shower room. . the shower room style has a corner and a font, according to the personal bathroom layout to choose the appropriate style. . in strict accordance with the assembly process to install the shower room. . the installation to ensure that the shower room and the building structure connected firmly, can not have shaking. . if the choice of open-type shower room must use the expansion bolts, and non-hollow wall fixed, drainage, the basin of water is not more than 500 grams. . after the installation is complete check the sliding door and sliding doors are parallel or vertical, whether symmetrical. Sliding door to open and close smooth, can not have gaps or seepage phenomenon, shower room and bottom basin with silicone seal tight.
The first, the size of the embedded hole should be designed in the bathroom before the decoration; second, leakage protection switchgear wiring should be installed before the shower room to consider good, so as not to rework; Third, the shower room style according to the bathroom layout Fourth, the shower room must be connected with the building structure to be strong; Fifth, if the installation of the shower room has been installed before the water supply system and tiles, the best custom shower room.
Shower room installation Note 1: handling, the shower room level easy to make the glass broken, must be vertical and more than two people at the same time handling, and pay attention to avoid collision with the hard objects. Shower room installation Note 2: shower room after the opening of the glass should be placed directly against the wall, placed horizontally or uneven placement may lead to glass damage, resulting in property damage or personal injury. Shower room installation precautions 3: cleaning is strictly prohibited the use of acid, alkali, organic solvents such as chemicals and acid cleaning agents, otherwise it will damage the surface of the product; use of water or neutral detergent on the product surface clean, can not remove the pollution Trace, can be soaked with a small amount of alcohol cleaning cloth to remove stains; shower room installation Note 4: acrylic plate is easy to attach static dust, clean acrylic basin only with cotton cloth dipped in a little soapy water can easily remove the dust Cleaning effect. Shower room installation precautions 5: the use of sealed silicone, silicone rubber should not be coated on the surface of acrylic. If you accidentally painted a little remember not to rush to wipe, so more difficult to remove, should wait until after curing gently peeled out, is strictly prohibited with a hard object scratches, otherwise it will lead to surface damage. After the bottom basin is installed, it should be used after the silica gel is fully cured (silica gel curing time is 24 hours). The above is the relevant shower room installation precautions, hoping to give you in the decoration when the bathroom can play a certain role in helping.

Share to: