What are the steps behind the construction of the building after the closure?
1, parapet masonry, stucco 2, the roof to find slope 3, roof leveling layer 4, roof waterproof 5, waterproof protective layer
Hurry to do roof insulation, waterproof ah! If you encounter rainy season, do not do waterproof on the trouble ah!
The frame is made up of the staircase or the staircase. Mixed structure: do ash cake, elastic line, ready to accept and install the door frame.