What is a bathroom, a sink, a stone counter, like a hotel? Is to do or do or what Mason woodworking work?
It's done before tiling:The first is the carpenter cabinet structure, the first nail wooden keel on the wall (be careful not to nail the wall embedded pipes), then let woodworking do you require the size of the cabinet, and then do cabinets installed on the wall of the keel, pay attention to keep basin and pipe hole.Then the bricklayers do, with marble, marble glue on the cabinet table, if it is a concave hole marble basin, but also pay attention to, and as a board. The marble packed and put tiles, and finally put the basin.
Then the steel sticks marble, marble marble to manufacturers who responsible for processing and installation, but before all these things you need a bathroom design drawings, a standard table thickness and width and height, so the height of the table in general, is to hand wash basins on the left and right from the 820mm, when people use the most comfortable, the table is too high, when washing water will flow back to the sleeves, too low, still have to bend over, with uncomfortable.
From personal experience, suggestions after tiling do ah, if you want to do the bathroom hanging the table, need to find local welding metal processing of a steel frame fixed to a wall to find the installation workers