What is the construction plan of outdoor fake grass?

What is the construction plan of outdoor fake grass?

Answer:

Outdoor fake grass maintenance.Turf construction is completed, the rain, the temperature changes, creating a surface without bias, drainage performance will gradually appear; During this period the uniformity of filling and thickness should also be inspected once every two weeks.
The underlying fabric laying of the outdoor fake grass.Non-woven fabric laying Single-layer consequent arrangement, stitching between each non-woven must be complete. The underlying non-woven fabrics must be laid flat, not have wrinkled appearance. Non-woven fabric at both ends must be fixed.
The preparatory work.The basis of outdoor fake grass use cement cast-in-place concrete or asphalt, has a certain strength and stability .Does not produce cracks and frozen peeling of foundation or up .Basis of flatness, 3 m straight edge error is less than 4 mm, has a certain slope, general for 3-5%, so that rain drainage .Basis to keep clean and dry surface, after the completion of the asphalt base should guarantee the maintenance period of 30 days or so, so that the asphalt surface low boiling point elements volatilize, bao aaa certificate based surface have sufficient bond strength.