Home > categories > Construction & Real Estate > Pull-push Prop > What is the range of adjustment for the full range of scaffolding?
Question:

What is the range of adjustment for the full range of scaffolding?

What is the range of adjustment for the full range of scaffolding?

Answer:

Bracket vertical control vertical pole vertical and horizontal bar level, the vertical deviation of the whole frame shall not be greater than h / 500 (h for the pole height), but the maximum does not exceed 20mm;
From the safety considerations, the adjustment range of the top care is about 45% of the total support, can not exceed 50%, otherwise it will cause instability.
Adjustable jacking adjustment range within 20cm.

Share to: