Is not the 10-4-100 constructional column composite formwork steel support, how to calculate the price?Is not a fixed price deduction combination of steel and wood composite template? 314.16-5.6*2.03-35*0.193=296.037 formula of the 5.6 and 35 how come?
Third, your understanding is right. The fixed price includes human machine, unlike the list is single, the quota is generally comprehensive unit price.So, the fixed price deduction combination of steel and wood composite template such understanding is right.314.16-5.6*2.03-35*0.193=296.037 is 5.6 and 35, these two quantities should be the combination of steel and wood composite board price.5.6 deduction and 35 price is 2.03, and 0.193 is the amount of engineering. So, you should be able to understand
Construction column bamboo plywood template steel support and structural column composite steel formwork steel support swap, you have to be marked in the back, after all, these two are not the sameSecondly, you have to price adjustment in the price, the price is certainly different.
Pro, I would like to ask you what is the norm of the quota is your local?I am here the quota is Anhui 2000 synthesisItem number is different, but there is one thing you have to pay attention to them.