Home > categories > Minerals & Metallurgy > Copper Wire > When building tiling, why stick 2 red copper wires on the tile?
Question:

When building tiling, why stick 2 red copper wires on the tile?

When building tiling, why stick 2 red copper wires on the tile?

Answer:

If you have a larger tile and heavy weight on the flue, it is recommended that you use the copper wire hanging at the same time, and then use the expansion screws on the front of the tile. When the tiles have been posted on the wall, with a glass diamond on the tile surface drilling, then rotate 8 cm expansion bolt reinforcement, expansion bolt head can be decoration materials to the store to buy a suitable metal round cover, beautiful and generous.
The re tiling in the original level, but to the back of the ceramic tile process increase wire hanging. Very simple, in the back of the tile edge cutting machine on the inverted "A" slot, copper wire embedded slot, with marble glue wire. When the cement mortar is attached to the tile, the steel nail is added to the wall, and the copper wire is tied to the steel nail to reinforce the tile. Bricklayer workers know that this kind of quasi dry hanging tile "the process is very simple, but the firmness increased greatly, will not lose the tile.
If you have to attach tiles, you can only put a heat barrier (heat preservation board) on the flue, then hang the mesh with cement mortar, and then paste the tiles. In this way, the heat of the flue is greatly reduced, and the ceramic tile layer is easy to hold the ceramic tile by hanging the net.
2 red copper wires stuck on the tile will increase the solidity and the tiles will not fall again.Flue heat is too high, too dry, really should not be paved with tiles.

Share to: