We are high-rise buildings, with the smart recharge meters, before always someone to reflect the water used soon, 27 tons of water in only a month has gone. Later I heard that the water meter in front of a check valve on it, but when the five tons of water after the use of nothing, and nothing. Why does that happen? Does the check valve stop the water meter from idling?There is a special case, thirty storey building, booster pump has a pressure in the debugging of the fifteenth layer of what, every time on the twentieth floor of the owners reflect his home water intermittent, sometimes when a shower suddenly no water, we always to reflect the property many times, we are the plumber debugging a few times, or not. Later said that can not be adjusted, and then the tune will burst, and this is how it happened? How can I solve this problem? Why didn't the owners of the thirty and fifteen floors reflect the shortage of water pressure? But the owners of the more than 20 floors are so unlucky?
4. conclusionMany reasons for water rotation, but on the whole can be divided into two: one is the subjective factors, namely subjective causes, such as construction acceptance, human responsibility caused by Water Leakage, original gas gathering, which can strengthen the construction management, improve the staff's work and to improve the level of responsibility. The two is the objective factors, the main characteristics of the water itself, by the characteristics of pipeline and the level of technology development in the external objective factors, on the one hand to work in the future continue to explore the improvement will be improved.
2.3 installation methods and installation quality2.3.1 since the water meter is now out of the door, most of the units are all concentrated in one box and installed on the first floor. Taking into account the freezing cold winter and the meter, with 6 or 12 meter with a diameter of 40mm- 50mm diameter pipe, tables and small spacing and straight sections set aside less water, this will also affect the normal water metering, causing water rotation.2.3.2 installation quality, pipeline projects are basically buried in the ground or in the wall, is a hidden project. National construction standard pipe provides various pipe pipeline construction installation requirements, construction process, acceptance criteria and matters needing attention, but in the construction site, some managers do not according to the requirements of the code construction, more or less there are some quality problems caused by pipeline.