The wooden plank road construction, the steel structure and the template pavement, the railing installation all construction labor cost to want how many money? Or how much a square?
Labor costs per ton steel production and installation: material loss making 1000 to 1300 + 3%+, 400 + 600+ installation to transport tax management fees, general standard workshop, steel 3 to 10 yuan per square metre, specifically to see the extent of the version and the difficulty
Under normal circumstances, in accordance with the plant area of about 30--60 per square meter. For reference only.
Light steel structure or heavy steel structure, labor costs are not the same