Not transformer. It's wires and meters. Because the transformer is public. If 10 kilowatts is not enough. How much is enough?
160T injection molding machine, if you want to use electromagnetic heating control panels for energy-saving transformation, the easiest way is to determine the original electric heating block is a few areas? What is the power of each zone? Then, in accordance with this to match the line, a few zones with several electromagnetic heating control panels, the power of each board and the power of the same heat block, or close to the line. In this way, the power saving rate can reach more than 40%, and the production efficiency can also be improved by about 20%. The friend in need can find Xin Rui energy saving manager, consult the order, and have professional technical guidance!
You should be talking about the transformer capacity! 10 kilowatts is far from enough. Even if it was barely brought up, it would have a great impact on the life of the equipment.The wire is good. The meter is for the current!
160t injection molding machine, electric power and motor power in about 25 KW. As well as auxiliary machine: 50kg drying hopper, about 4.5kw. If it is hot runner mold hot runner power in 8-15kw (see details) mold temperature machine power is about 6kW that gives you power far enough. Injection molding machine production, power is about 60% of the rated power, or 15KW. So, if only drive 160T machine, do not deserve any auxiliary machine, at least 15KW.