Home > categories > Electrical Equipment & Supplies > Control Cables > ASUS x503m forced shutdown after the power indicator has been flash, can not open the machine how to do
Question:

ASUS x503m forced shutdown after the power indicator has been flash, can not open the machine how to do

ZC and ZRB two kinds of control cable are different? Only know that these two are flame retardant.

Answer:

XLPE insulated, steel tape armored PVC sheathed power cable, TJ ------ cross-linked polyethylene insulation, V ----- PVC sheathed, 22 --- steel armor Installed, rated voltage 0.6 / 1KV, 5 ----- cable core number 5 core, 10 ----- single cable cross-sectional area mm2.
RJ45 patch panel, mainly used for the distribution of the engine room from the distribution network through the distribution frame and then assigned to the user, but also easy to manage and maintain
The size of the socket box, you should first look at its thickness, can be buried in the wall of the powder surface layer? So that is installed, the installation of the socket under the pipeline meaning is not big. Buried in the floor is a special outlet, you are not afraid of damp water to bring the safety of what!

Share to: