Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The

Building interior decoration (construction) construction time node, for example, the wall putty putty, spray latex paint and doors and windows frame installation, paving tile order The

Answer:

Step 3: the wall of the demolition; the second step: the transformation of water and electricity; the third step: paving the kitchen bathroom wall; waterproof; tiles fourth step; woodworking approach; fifth step; Six steps; installation, etc. follow-up work
The principle of built-in construction should follow the principle of the first, the first after the next, is the mud after the wood (finishes) of the major principles, specifically as follows for reference: room closed (outside the door window frame - glass installation and protection) The ceiling of the mechanical and electrical end of the positioning of the ground surface of the ground, waterproof; door door installation; the installation of the wall, Wall ceiling, ceiling paint primer and in the coating; installation of wooden doors, wooden finishes, fixed, the top of the wall Furniture; installation of wood flooring; receiving baseboard, switch panel; baseboard switch panel around the second leveling; paint surface; lighting and other mechanical and electrical terminal installation.
Only for the living room and bedroom (kitchen and toilet can be synchronized) grass-roots treatment --- Chong Qiang --- wall head putty --- floor tiles - installation door frame, bag mouth --- grinding to find --- 2 times putty , Baseboard installation --- last latex paint. Note that as long as do not let the tiles polluted the walls of the final finish on it. Want to save points to scratch the end of the sub-package door. Intermediate processes are generally not so rigorous.