Difference between Artificial Digging Pile and Bored Pile
Artificial digging pile is made of artificial digging pile. It has the advantages of simple equipment, convenient operation, small construction site, small influence on surrounding buildings
Bored piles with good seismic performance, bearing capacity, construction noise is small, can solve the special load capacity of the foundation and many other advantages. At present, the foundation of bored piles in the field of highway and bridge engineering has occupied an important position
Can be used for high-rise buildings, public buildings, hydraulic construction pile, for support, anti-skid, retaining the use. On the soft soil, flow sand, groundwater level is higher, the water content of large soil should not be used.
reliable construction quality, construction in short time, shortening construction time and low cost The So it is widely used. Artificial digging pile is suitable for soil with better soil, lower groundwater level clay, sub-clay, with a small amount of sand and gravel clay layer.