Home > categories > Construction & Real Estate > Flexible Duct > Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
Question:

Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota

Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota

Answer:

Air conditioner is the air temperature, humidity, purity, air speed, for processing, to meet people's production and living needs of the equipment, referred to as air conditioning
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long and 4m each) and the fasteners are transported to the hanging plate of the frame
First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.