How do I calculate the number of batteries in the UPS battery pack?
According to the demand for delay, some users need to delay a long time, a group can not be met, you can connect a group.
Mountain C2KS, DC voltage 72V, you need 6 batteries (one is 12V), an input head, a group can be. APCSURT10K long machine, DC voltage 384V, requires 32 batteries, two input head, then the two groups of 16 access.
According to the UPS appearance parameters, see how much the total DC voltage, and then access is divided into several heads into the UPS.