Interior decoration of the positive and negative 0.000 line is how to release it?
Interior decoration of the positive and negative 0.000 line is so can be released: according to the original floor of the original floor of the concrete layer of the highest point of the lofting as positive and negative 0.000 lines
Such as floor, sanitary ware, tiles, tiles, paint, kitchen utensils, locks, hardware, etc., some other accessories have a construction team to arrange, such as sand, nails, nails, Cement and so on. This will be harder to do so, but the material quality and budget are easy to control. Advantages: . select the main part of the initiative, is the so-called "grasping the key." . the main building materials to buy their own, whether in security or economic are more at ease. . by the decorating company to help their own design, so they do not have to go to study design, as long as a lot of understanding of building materials can be. . auxiliary building materials by the construction team rationing, small things also save a lot of power. Disadvantages: . or a lot of time to run the building materials market, can not be easily renovated. . in the contract must be clearly marked by the decoration company which, which by the owners to buy their own, otherwise it is easy to decorate the company in the late loopholes, made what they have to buy, very tired and very passive. All packages are also called package workers, all materials procurement and construction by the construction side is responsible. Advantages: . the owners worry and effort, to do is only timely and communicate with each other, so that the other party to understand their own intentions, supervision of the basic progress of the project and quality. . by the decoration company to design, more professional, the possibility of future regret less. . design, construction, materials are replaced by the same company, the final effect will be more complete, more unified style. Disadvantages: . today's decorating market, the company and the staff of good and bad, identify the selection is indeed not easy. . encountered some irregular companies, the opportunity to be taken seriously. . especially in the purchase of building materials, may be decorated company loopholes.
Permission to operate the project is to say that other departments need to first examine the business sector to approve the project, such as: dangerous chemicals need to safety supervision and approval of safety production license, the drug needs of the SFDA approval permit
Positive and negative zero is the first floor of the building elevation, set to positive and negative zero. In general, the first floor of the ground will be higher than the outdoor floor. According to the architectural intention set, ordinary residential higher than the outdoor floor 500 to 1000 like. Auditorium, etc., will be higher, there are magnificent results. It can be said, according to the design intent of the first floor of the ground elevation, set the results. Generally based on the horizon as the standard, higher than the horizon is positive, lower than the underground line is negative. Positive and negative zero refers to the main project of a datum, in the main project under the base of the project is completed, the main construction of the ground when the project, that is, the main project to achieve positive and negative zero. Generally speaking, the normal construction plan in the total plan is ± 0.000 elevation with the absolute elevation of the topographic map, if not marked the absolute elevation that asked Party A, do not make the decision to set this ± 0.000 will be in trouble The