Question:

How many hours will it take for the 200 piles and the 1 pile drivers?

How many hours will it take for the 200 piles and the 1 pile drivers?

Answer:

200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
200 piles of 1 piling machine is generally need 19 day time is finished, also need 152 hours to complete.
First of all, depends on what you are Then you can count on the experience, how long does the 200 take?
Depending on the groundwater and the readings, I estimate that the minimum number of people is 1 months to 45 days. If the machine is good. No problem for a month.
Because there is a piling process: measurement line - out pile connection - send pile inspection -- moving pile pile machine in place -- the original check -- prefabricated pile precast pile lifting pile stabilizing pile -- -- --.It depends on what kind of pile, the diameter of the pile, the geological condition, the construction site, the construction organization and so on.Taking prestressed pipe pile of 18M as an exampleAbout 20 per day, about 10 hours / day, and that is exactly every half an hour. This refers to the "stability, pressure, connection and delivery" critical progress, because other schedules can be arranged in parallel. While not completely parallel arrangement, the efficiency drops by half, that is, it takes 1 hours to hit a pile.So it takes a lot of skilled workers to finish the job faster.