Less than 200mm from the foot, the middle spacing of not more than 450mm
Briquettes only play a fixed frame material role, the actual waterproof process is to rely on sealant and sealing tape, so the briquet does not need long, as long as the basic function can be achieved on the line!
The pressure plate is not can not be segmented, the key or according to the actual requirements to set: 1. Segmented use of pressure plate, must be filled with foam sticks after the glue. Long pressure plate can have a plastic seal, glue seal and seal after the installation of plastic tape. Seal from the way, the sub-pressure plate can not choose more than through the long press plate. 2. The installation and positioning of the sub-plate is more difficult than the long press plate. Segmental pressure plate of the various pressure plate is easy to install when the uneven, tilt and so on, resulting in difficult to install the buckle board. 3. The amount of sealant used in the sub-platen is not well controlled because there is no platen, the foam strips are floating, and the buckle is loosened and easy to enter more glue. 4. Sub-pressure plate, or a lot of aluminum than the long press plate. You can refer to the practice of hidden curtain wall, should adopt not more than 300MM set a about 25 ~ 35MM of the briquettes.

Share to: