The precondition for installation of electrothermal film: 1) Construction drawings and other technical documents are complete. 2) The construction design or construction?scheme has been determined and technical disclosure is completed. 3) Materials, tools and construction manpower which meet the requirements of construction are ready. 4) The plastering of the internal walls has been completed and the ground engineering has ended. Other invisible pipeline project has ended. 5) The floor is clean and has no sundries on it. 6) Distribution box is in place. The project of power supply and other branch circuits has ended. The installation process of the intelligent electrothermal film (floor) heating system is as follows: (1) Clean the floor and install the extruded board; (2) Install the electrothermal?film; (3) Connect T-cables; (4) Buckle extruded boards; (5) Test the multimeter; (6) Install the temperature sensing probe; (7) Install the temperature controller; (8) Electrify and test.
Electrothermal?film can be divided into several categories, namely printing ink, carbon?fiber and metal film. It is all in the form of a roll. To install the electrothermal?film floor-heating system, we must flatten the cement ground first. And then clean it up and install the electrothermal film on the floor. The wires must be parallel connected, insulated, and wrapped in silica gel. The final step is to test. If all goes well, we can continue to install the parquet. The installation of temperature controller is required. After setting the temperature, we can use it normally.
First, flatten the cement mortar. Then lay a layer of waterproof film. After that, lay several layers of composite wood flooring. The wood flooring of thickness of 0.3~0.5mm can be enough.