Question:

How to put on the marble floor of high rise building

How to put on the marble floor of high rise building

Answer:

First look at the marble staircase design, and then according to the size of the staircase.
The total number of steps can be calculated for each height divided by the high amount of each run and how wide and then calculate each need how wide the most at the end and the highest step step with thread sequential paving OK level
For example, now cement stairs step level: pedal 250mm, kick board for 180mm. Requires more than the pedal pedal plate convex 20mm out. (marble thickness of 20mm) so that you can calculate: pedal: 250+20=270mm. (one of which has a thickness of the plate is repeated, not counting inside) kick board: 180-20=160mm. The first step from below is not required to reduce the thickness of the 20mm pedalThe main line is the upper and lower ends of the line, to maintain the slope of the vertical plate and flat plate are the root height and width of the bisection.

Share to: