Home > categories > Construction & Real Estate > Wash Basin > How to remove the hot and cold water pipes under the washbasin
Question:

How to remove the hot and cold water pipes under the washbasin

How to remove the hot and cold water pipes under the washbasin

Answer:

Each kitchen and toilet equipment are different, pay attention to see the instructions, the instructions should be painted on the installation map. No one can specifically tell you how to unload. Besides, pretend to unload it? Brand business design is very sophisticated and reasonable, part of the unloading, will affect the use of quality
The faucet removed; easy to change ~ hot and cold pipe for the words is very simple ah; put the end of the end of the connection to the end of the screw down ah; also no special place;
A mixed nozzle installation: the mixing nozzle tip plus 1mm thick pad, putty. Insert the basin along the middle of the hole in the eye, the bottom of the pad and eye socket, righting mouth, tighten the root of the mother to the elastic moderate, with a good water lock mother. B will be cold, hot water valve cover to remove, retreat lock the mother, the valve from bottom to top into the basin cold, hot water hole. Valve lock mother and rubber ring into the cross-tube, and then the valve on the root of the mother plus putty and 1mm thick pad, the root of the mother tighten and silk flat. Close the door cover and tighten the door cap screws. C washbasin mouth plus 1mrn thick pad, putty, inserted into the basin drainage hole inside, outside with pads and eye socket, silk at the Department of oil, wound Ma. With a self-made wrench stuck in the mouth of the cross bar, screw into the water three-way mouth, so that the mouth back, the overflow to the face of overflowing eyes. The following are the same as the " D Put the handle rod and the spring universal bead into the center of the tee, and tighten the lock to the elasticity. And then put the pole through the mixed nozzle empty tube to the four under the mouth, four-way and pole interface at the oil pan rope, tighten the tightening nut. Stand, cross bar with a good link with a good, while adjusting the positioning.
First good size, with a short tube. Fitted with watermarks. And then the other end of the short tube at the end of the Department of oil, wound Ma, screwed in the reserved water supply pipe (if it is concealed pipe, with a mouthpiece plate, first to protect the mouth plate set in the short section, , Will cover the mouth filled with putty, to the wall leveling, according to the real, clean up the overflow of putty) to moderate elastic. Will be brass (or plastic pipe) then cut the size of the need to simmer light fork bend the curved simmer good. (Or plastic tube), respectively, wrapped around the oil pan rope or lead oil linen, the top into the mouth of the nozzle, the bottom of the mouth into the water door in the mouth, the bottom of the mouth,

Share to: