HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt