I would like to know the control cable RVVP2 * 0.75 * 10 is what does that mean? The The
Yes, but to consider the problem of space, 17AH battery than the size of 7AH battery much larger, if the battery is inside the UPS, the space may not be enough.
Cable factory have a certificate, first look at the appearance of looking at the cable cross-section, as the insulation and cross-section measurement requires professional tools
Harness industry production scheduling scheduling What are the difficulties, APS advanced planning scheduling system application situation, there are no success stories?