Home > categories > Rubber & Plastics > Plastic Sheets > Plastic gusset plate how to install the diagram?
Question:

Plastic gusset plate how to install the diagram?

Plastic gusset plate how to install the diagram?

Answer:

Mounting boom. The installation should meet several requirements: first, and the bearing capacity of the hangers should be straight enough; secondly, we should advance to suspender rust; boom from the keel end shall not exceed 300mm, otherwise should be added if you need additional boom, boom, best lap welding, the main keel to avoid falling;
Main keel installation. The hanging distance of main keel should be selected according to the design. The middle part should be arched and the arch height of the keel should be no less than 1/200 of the span of the room. After the main keel is installed, correct the position and height in time. The vertical and horizontal elevation control line is drawn out, and the suspension height of the boom is adjusted from one end to the other, so as to control the formation of the keel. After the large surface has been leveled, the single keel with bent edges should be adjusted until it is smooth and meets the requirements. In the installation of the main keel, but also pay attention to leave the exit of the lighting line;
1. install plastic gusset plate suspended ceiling, the first step is to determine the location of the ceiling installation, that is, ceiling height. Usually the ceiling should not be too low, the height is too low, it will make the space seem depressed. The installation height, mark elevation around the wall elastic line, datum line mark to clear;2. according to the ceiling design, suspended area to determine the size of plastic gusset plate;3. determine the keel position line. Because the keel is mainly used to support the outside decorative material shape, fixed structure, the plastic gusset plate size has been determined, in order to ensure the integrity of the installation, to determine the structure size and location of the keel line according to the panel specifications, top line of position and will determine the scale at base line;
The installation of the main keel, the installation of the boom, the installation of the edge of the keel, the plastic buckle plate installation, to clean the site.

Share to: