Server what ups power lines
Server, then it is recommended to buy online, power outage conversion time of 0 seconds.
Home is generally a backup UPS, in the moment of power failure conversion time than the line slightly longer, and sometimes lead to restart, brand Well, APC, Sandton, Hills.
To give your server configuration appropriate ups power, it is recommended that you first understand the following aspects:
1. What is the number of servers and the total power?
2. What is the required power supply ups?
So as to know how much to the server with ups power and battery. As for the brand, the domestic can choose easy, foreign can choose APC, Emerson, but foreign brands to your side, but the speed of after-sales service than the domestic slow So from the aftermath of the insurance to consider, choose the domestic brand more appropriate
Landlord, hello UPS models and brands are more, personally suggest that you can follow the following approach to start. 1, know all your server or other network equipment power. 2, add all the power you need to protect the power of the equipment to calculate the total power 3, according to the total power of all your equipment to calculate the capacity of the UPS 4, according to your needs to select the UPS brand and the corresponding model (for example: 5, according to your UPS brand, model, backup time you need to calculate the battery size and capacity (by the way you can also choose the battery brand). 6, according to the results of all the above calculated brand selection to find the opposite suppliers to negotiate the right price (you may be in accordance with the above requirements a lot of brands can meet your requirements, you can find the appropriate brand agents to consult, according to the most cost-effective agent Business cooperation). Hope to answer the landlord to help answer,
Brand recommended you choose Emerson, APC, Shenzhen Hills, Huawei, etc., the performance of the proposed you choose the pure online, the size of the words to be based on your back to the device to count, for example, you behind the server is a total of 8,000 watts, when the election UPS With 8000 watts divided by the UPS coefficient (usually 0.8 also has 0.9) 0.8 is 10,000 watts is 10KVA machine, but then you have to give the machine a little reserved space, to zoom 1.25 times is 12.5KVA, Because there is only 15 or 16 of UPS, there is only 15 or 16, and there is only 15 of them, and there is only 15 of them.
You ask this question is more broad,
Server UPS from hundreds to hundreds of thousands of dollars have.
It is recommended that you use the following parameters to determine the UPS selection.
Number of servers
The power of the server
Time required for UPS power supply (eg 10 minutes, 15 minutes, 30 minutes, 1 hour, ...)
budget.
In our past to do the enterprise customers UPS program, corporate customers UPS general price in more than 10,000 to more than 30,000 / Taiwan / Taiwan.
Government agencies, securities companies and other UPS power supply programs are generally hundreds of thousands.