Home > categories > Construction & Real Estate > Curtain Walls > Stone curtain wall installation process, the role of the adapter is what
Question:

Stone curtain wall installation process, the role of the adapter is what

Stone curtain wall installation process, the role of the adapter is what

Answer:

Generally used in the floor between the floor, or used in other places there is no fixed point.
The adapter is fixed to the mullion.
Fixed shaft of the adapter, is to connect the embedded parts and the material, where the embedded parts, where the adapter. Fixed transverse material of the adapter, is connected to the material and the cross of the material, where the transverse material, where the adapter. In addition, a lot of fixed material will be fixed by welding, may not be used to transfer parts, the standard approach is the side of the welding side of the screw.