Switch socket when installed more reasonable?
Construction process:
1, wall transformation
2, hydropower construction
3, hidden engineering acceptance (check whether the water is available)
4, bathroom kitchen waterproofing
5, posted wall tiles, to turn
6, carpentry construction
7, the middle of the project acceptance (inspection of the basic part of the qualified)
8, paint construction
9, the wall side of the grass-roots treatment
10, polished, wall paint
11, installation switches, fixed furniture, hardware accessories, sanitary ware installation; wood floor installation
12, posted wallpaper
13, clean and sanitary
14, installation of cloth (curtains, etc.)
15, the completion of acceptance
Generally the final install ~ so that will not be dirty, but also more convenient to brush the wall of what ~
In the cement wall on the basis of the starting line and discharge sockets, and then lime in the cement wall covered with wires and water pipes and other facilities Finally, when the switch base to pay attention to the accounting plus lime surface and wood or tile wall decoration materials Of the thickness, so as not to decorate the surface after the switch base raised in the wall. Affect visual effects!
After the end of the end of the installation, there are three reasons
First, brush the paint can not be installed before, because this installation and then brush the paint is easy to dirty the panel, and sometimes in order to escape these panels will produce the walls of the vertical brush
Second, floor tiles, etc. do not install the panel, so easy to dirty
Third, when installing the kitchen cabinet do not install the panel, some on the cabinet, be sure to install the cabinet after the panel installation, which can also prevent the installation of the kitchen because of the cutting panel position cutting is too large, very Easy to move Xiaoqiang