Power industry, Taiwan change, Taiwan, transformers in the concept of what is the difference?
Also, what does the measurement point mean?
First into this line, hope you brothers help.
Metering points are generally placed on the two sides of the equipment for property rights demarcation point. Some "real production boundaries" are not suitable for loading tables, the measurement points can be located in the substation, if the measurement point and production to the demarcation point is different, the asset owner should bear the loss of their own property equipment.
For the substation of the various routes, the measurement point is located in the various routes on the outlet.
Transformer two transformers run parallel to the situation is very common. Parallel operation can make the power quality better, and better play the potential of equipment and so on.
Transformer refers to equipment;
Taiwan change is installed in a place of the transformer, is specifically installed, running a transformer;
Taiwan area refers to the regional range of variable power supply.
Metering point is for the two sides to determine the installation of electric energy meter position, in general, the measurement point should be set at the demarcation point of property rights.