To warm the construction, structure and filler selection and how to coil?

My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat

Answer:

To warm is actually a more complex system engineering, only concerned about the quality of the product is not enough. Do the floor insulation system should be laid before the construction of civil walls have been completed, and done the basic leveling, the venue no other types of construction in the construction. The temperature of the construction room should be in accordance with the required temperature of the pipe used, because the ambient temperature and the bending radius of the pipe are closely related. Cleaning the ground and the wall, the use of level ruler on the ground flatness, within 1 meter height difference is less than or equal to 5 mm. Wall or ground protruding part of the shovel with the shovel, filled with concrete pits on the ground. Bathroom and the bottom of the villa should do a good waterproof layer or laying moisture film.
My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat...

Share to: