Question:

What are the ancillary facilities for construction works?

What are the ancillary facilities for construction works?

Answer:

Housing ancillary facilities: elevators, air conditioning, security equipment, lighting equipment, fire equipment, monitoring equipment, integrated wiring, weak systems, water supply and drainage equipment, etc ... .... Guo Shui Fa [2005] No. 173 on the housing ancillary equipment and ancillary facilities levy property tax issues, "the Ministry of Finance, the State Administration of Taxation on the property tax and travel tax on the interpretation of a number of business issues and regulations" ([87] fiscal word word 003 No. 2 has been made clear. With the socio-economic development and improvement of housing functions, there have been some new equipment and facilities, need to be clear. In order to maintain and increase the use of housing functions or to make the house meet the design requirements, where the housing as the carrier, can not move the ancillary equipment and ancillary facilities, such as water supply and drainage, heating, fire , Central air conditioning, electrical and intelligent building equipment, whether in accounting can be a separate accounting and accounting, should be included in the original value of the property, levy property tax. Second, for the replacement of housing ancillary equipment and ancillary facilities, in its value included in the original value of the property, you can deduct the original value of the corresponding equipment and facilities; ancillary equipment and ancillary facilities in the damaged, often need to replace the spare parts , After the update is no longer included in the original value of the property.
If it is built, then the building of the ancillary facilities: connected with the house covered with no pillars of the corridor, eaves Gallery; is a permanent building independent column, single row of porches, sheds, shed, etc .; Balcony, no corridor; outdoor roof with no cover; a permanent overhead gallery with no cover. Facilities: elevator shaft, garbage road, substation room, equipment, public hall and aisle, basement, duty guard room.
You said that the "ancillary facilities" should be the list of measures mentioned in the list of bars it. General measures Item . Safety and civilized construction (including environmental protection, civilized construction, safe construction, temporary facilities) . night construction . closed operation lighting costs . secondary handling . winter construction reduction . rainy season construction fee 7 , Large-scale machinery into and out of the installation and installation . concrete, reinforced concrete template and stent . scaffolding . has completed the project and equipment protection . the construction of drainage and drainage . the completion of the acceptance of archiving data preparation of professional measures are: Steel bars