Home > categories > Machinery & Equipment > Tower Cranes > What are the requirements for jack up and plus section of jack up tower crane?
Question:

What are the requirements for jack up and plus section of jack up tower crane?

What are the requirements for jack up and plus section of jack up tower crane?

Answer:

Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
When lifting, a standard section is hoisted on the imported beam or introduced platform. Then open the pins or bolts connecting the standard section with the slewing support. Start the oil pump, so that the cage in the standard section of the outward sliding, until the release of a standard section position, and then imported beam or imported platform on the standard section into the connection. This completes a process.
Ask you experts on the construction site of self lifting tower cranes how to install?. Is it like lifting a jack up of a car jack and hanging it in the middle when it's empty?