What instruments and equipment are needed for building energy efficiency testing?
Equipment needed: building energy saving test indoor environment: temperature and humidity meter, anemometer, air cover system performance: ultrasonic flow meter, power meter, performance envelope: pitot tube heat transfer coefficient measured by conductivity meter.
Curtain wall performance testing including wind pressure deformation performance, air tightness and water tightness performance, which is usually called "three test". If necessary, the in-plane deformation performance and other properties can be increased. That is, the so-called "four sex"". Two, the angle steel and channel steel does not need re examination, re examination of the need in the curtain wall engineering materials are: 1, the peel strength of aluminum-plastic composite plate; 2, stone stone cold area bending strength, freeze-thaw resistance, indoor granite radioactive; 3, curtain wall structural rubber hardness, tensile bond the strength of standard conditions;
Building energy saving test, is to use a standard method, suitable equipment and environmental conditions, professional and technical personnel to use energy-saving building materials, equipment, facilities and buildings for the thermal performance and thermal performance and related technical operations, it is an important means to ensure the construction quality of the building energy saving. As compared with the routine construction quality inspection, the quality inspection of the building energy efficiency project is divided into two parts, that is, laboratory test and field test.