What is the glass curtain wall column
The glass curtain wall column is the vertical keel supporting the glass, usually through the adapter with the main structure of the buried or embedded parts to connect. Then install the lateral keel on the vertical keel, the glass is fixed on the keel
Columns are generally vertical components, is the curtain wall installation and construction of one of the key, its quality affect the installation of the entire curtain wall quality. The allowable deviation of the distance between the plane axis of the connecting curtain wall and the outer plane axis of the building should be controlled within 2mm. In particular, the building is curved, rounded and surrounded by closed walls. The distance between the inner and outer axes affects the circumference of the curtain wall Should be taken seriously.
Columns generally according to the construction and transport conditions, can be a layer of tall or two-story high as a whole, the length of up to 7.5m. Joints should have a certain gap, the use of sleeve connection method, which can adapt and eliminate deformation of the building And the effect of temperature deformation. The connection between the connecting member and the embedded part, if it is a two-storey building, can be separated by hinge and rigid structure, hinge only anti-level force, and just in addition to anti-level force, but also bear the vertical force Passed to the main structure.
A glass curtain wall is a building outer envelope or a decorative structure that has a certain displacement capability relative to the main structure by the support structure and does not share the function of the main body structure. The walls are made of single and double glass. Glass curtain wall is a beautiful and innovative architectural wall decoration method, is a modernist high-rise architectural era of the salient features.
The glass curtain wall column is the vertical keel supporting the glass, the column is connected with the connecting member first, then the connecting element (iron code) spot welding on the embedded steel plate, and then adjust the position. The verticality of the column can be controlled by the hammer, the position is highly accurate, in order to be officially welded to the embedded parts.