Home > categories > Construction & Real Estate > Geomembranes > What is the installation technology of soft membrane?
Question:

What is the installation technology of soft membrane?

nan

Answer:

When installing the soft membrane, the first is to install the four angles of A, B, C, D, then the diagonal pull point installation, finally all installation. The installation sequence: 1. Before the entering of the soft film smallpox, the site must be electrified and without construction waste. 2. The deal with the bottom of the piamater ceiling should be fit for the installation conditions, such as the installation of the steel and so on; it must be cleaned. 3. All the installation of the lights must be according to the requirement of us. We should ensure all of the circuit to be electrified. If there are any lamp not lighting up before installing the soft film, it should be adjusted and repaced in time. The interior hidden lights should be painted with white paints so as to get a better effect. 4. The air conditioning and fire pipes must be arranged in advance and debug to keep it operating well. After the installation of the air inlet, spray head, and smoke sensor, all of them should meet the requirements of us. 5. After the installation of the piamater ceiling is completed, for example, the paint should repair the gypsum board and should not touch the soft film smallpox.

Share to: